Home | Personnel | Research | Publications | ||
CFD modeling |
Intensive measurements over Complex Terrain Xu, X., C. Yi, the influence of geometry on recirculation and co2 transport over forested hills, Meteorology and Atmospheric Physics, 2012, DOI: 10.1007/s00703-012-0224-6 . PDF Chen, H., and C. Yi, Optimal control of katabatic flows within canopies, Quarterly Journal of the Royal Meteorological Society, DOI:10.1002/qj.1904, 2012. PDF Wang, W. and C. Yi, A new nonlinear analytical model for canopy flow over a forested hill, Theoretical and Applied Climatology, DOI 10.1007/s00704-012-0599-9, 2012. PDF
Yi, C., R. K. Monson, Z. Zhai, D. E. Anderson, B. Lamb, G. Allwine, A. A. Turnipseed, and S. P. Burns, Modeling and measuring the nocturnal drainage flow in a high-elevation, subalpine forest with complex terrain, Journal of Geographical Research, 110, D22303, doi:10.1029/2005JD006282, 2005. PDF |
|
The eddy covariance technique has become the most useful method to quantify ecosystem carbon sequestration. Complex terrain and complicated canopy structure create difficult conditions that can induce non-ignorable advection errors during calm nights. Both advection experiments and model simulations have demonstrated that the signs/magnitudes of advection flux components are related to the tower-location over complex terrain. We intend to use a seven tower setup to examine simultaneously several typical advection problems on a single forested hill in the Black Rock Forest (BRF). | ||
Wang, W. and C. Yi, A new nonlinear analytical model for canopy flow over a forested hill, Theoretical and Applied Climatology, DOI 10.1007/s00704-012-0599-9, 2012. |
|||
|
|
||
Our CFD numerical model predicts that these recirculation bubbles have huge influence on CO2 exchanges between forests and atmosphere. |
|
||
Yi-Hendrey group wants to measure these bubbles by setting up a two-tower system at Black Rock Forest |
|||
|
|
|
|
We will use the existing BRF tower on the hill top
|
Second tower delivered to BRF (Tree and George)
|
||
September 21 (Friday), 2012 Set up the slope-tower with helps from many people (see the names below)! |
|||
The team is on the way Nir Krakauer, Eric Kutter, Kale Clauson, George Tsagalas, Christine Ramadhin, and Tree Yi |
where is the broken point of the slope (second tower location)? John Brady, Eric Kutter and Tree Yi are looking for |
||
Carrying the 100-ft tower into position John Brady, Ben Brady, Nir Krakauer, Kale Clauson, Wei Wang, Eric Kutter and Tree Yi |
The tower must be perpendicular to the ground Tree Yi, George Hendrey, Eric Kutter, Nir Krakauer, and George Tsagalas |
||
Donna Gangadeen, Tim Eaton, Wei Wang, John Brady, Nir Krakauer, Eric Kutter, Kale Clauson, Tree Yi, Matt Munson, and George Hendrey |
John Brady, Tim Eaton, Wei Wang, and George Hendrey |
||
Tim Eaton, Eric Kutter, Wei Wang, Matt Munson, George Tsagalas, Ben Brady, Kale Clauson, Tree Yi, Nir Krakauer, and John Brady |
Tree Yi, Donna Gangadeen, Wei Wang, Eric Kutter, George Tsagalas, George Hendrey, Christine Ramadhin, Kale Clauson, and Tim Eaton |
||
George Tsaglasa, George Hendrey, Kale Clauson, Tree Yi |
George Hendrey and Joe Oliva |
||
George Hendrey was climbing the tower to fix some problems. |
This is second tower |
||
October 5 (Friday), 2012 Wenge led her team (Jing, Wei, and Christin) to measure leaf area density. |
|||
Wenge Ni-Meister and Christin Delgato were calibrating instrument Trac |
Wenge Ni-Meister and Christin Delgato were measuring Leaf Area Index (LAI) |
||
Jing Yuan and Wei Wang were measuring Leaf Area Density and tree heights |
Kevin Clinton and Eric Kutter |
||
October 21 (Sunday), 2012 George, Eric, Qianyu, and Tree discussed a work plan and prepared for tomorrow's work. |
|||
Qianyu, Eric, George, and Tree were discussing tower-system work tomorrow |
Qianyu, Eric, and George were busy in preparation instruments in the lab for tomorrow's field work |
||
October 22 (Monday), 2012 Eric, Qianyu, Wei, Kale, George and Tree worked on instrumental installation of the top-hill tower. |
|||
Black Rock Forest on October 22, 2012 |
Black Rock Forest on October 22, 2012 |
||
First test was to figure out how helmet can work |
This is the top-hill tower (BRF fire tower) |
||
Wei, Eric, George, Kale, and Qianyu |
Eric and Qianyu were mounting 3D-sonics, data analyzer and othersat top level (23.3 m) on the top-tower |
||
Wei Wang |
Eric and Qianyu |
||
Kale Clauson |
Kale was working for connections between the tower and a generator |
||
October 24 (Wednesday), 2012 George, Eric, Qianyu, Kale, Wei, and Tree worked on instrumental installation of fifth level on the slope-tower. |
|||
George, Eric, Qianyu, and Wei |
Wei and Qianyu |
||
This was Eric's first time to climb tower, being careful! |
was Eric and George were ready to go |
||
Eric started climbing and George was looking for more tools |
Eric and George |
||
Eric and George were fixing a pole on the tower to transport instruments up |
Kale and Qianyu |
||
Kale and Qianyu |
Qianyu was checking accuracy |
||
Qianyu, Kale, and Wei |
Qianyu was watching and directed the procedures |
||
Wei was cranking up the tower |
Kale was climbing the tower |
||
George was climbing the tower |
George and Kale were mounting the 3D-sonic at the top level |
||
George and Kale were mounting the 3D-sonic and Li-Cor at the top level |
George and Kale were adjusting them in north direction |
||
October 26 (Friday), 2012 George, Qianyu, Kale, and Tree worked on instrumental installation of fifth and fourth levels on the slope-tower, while Eric, Wei, Kevein worked on generators. |
|||
George and Qianyu |
George was checking tools |
||
Kale, George, and Tree |
Qianyu, Wei, Kale, Tree, and George |
||
Kale, Tree, George, and Qianyu |
George, Kale, and Eric |
||
Kale and George were discussing |
George, Eric, and Kale |
||
Tree, Kale, George, and Kevin |
George and Kale were climbing the tower |
||
George and Kale were working on the top level |
George and Kale were working on the top level |
||
George and Kale were working on the top level |
George and Kale |
||
George and Kale were coming down for lunch |
Eric led a team (Kevin, Xiyan, Wei, and Eric) to setup connections between generators and towers |
||
Cables and wires |
Everybody was having lunch but Qianyu wanted to finish hub work before her lunch so that the tower work could be continuous after lunch |
||
For preparation of today's work, Qianyu only had three hours sleep last night |
Qianyu, Tree, and Kevin |
||
Qianyu and Tree were moving something up to the tower |
Qianyu, Tree, Eric, Kevin, and Wei |
||
This was Tree's first time to climb tower, a little bit of panic. |
Wei, Tree, Kale |
||
Tree was climbing the tower |
Kale and Tree were connected cables and wires to the 3D-sonic and Li-Cor |
||
Kale and Tree were connected cables and wires to the 3D-sonic and Li-Cor |
Kale and Tree were mounted the data loggers for the fourth level |
||
Kale and Tree were mounted 3D-sonic for the fourth level |
Kale and Tree were mounted 3D-sonic for the fourth level |
||
This was the second Li-Cor for the fourth level |
Kale and Tree |
||
Kale was mounting data logger and Tree was connecting the Li-Cor |
Kale and Tree |
||
Kale and Tree |
Kale and Tree started working for another level |
||
November 1 (Thursday), 2012 Just after Sandy Hurricane and campus was still closed, Qianyu, Li, Kevin, Ning, Tim, and Tree came to crank tower, adjusted guy wires. |
|||
Tim, Qianyu, and Tree |
Ning and Kevin, Tree and Tim |
||
Tim, Qianyu, Kevin, Ning and Tree |
Ning, Kevin, Tim and Tree |
||
Kevin, Qianyu, Ning and Tree |
Tree, Tim, Qianyu, Ning, and Kevin |
||
Qianyu and Kevin |
Tim and Tree |
||
Tim, Qianyu, and Tree |
Tim |
||
Tim |
Tim |
||
Tim |
Qianyu and Tree |
||
Ning |
Qianyu, Tree, and Tim |
||
Qianyu and Tree
|
Qianyu and Ning |
||
Kevin and Tree |
Kevin and Tree |
||
Ning, Kevin and Tree |
Tim and Qianyu |
||
Tim and Qianyu |
Tim and Qianyu |
||
Tim and Qianyu |
Tim and Qianyu |
||
November 2 (Friday), 2012 Qianyu, Kale, Kevin, and Tree cranked tower, adjusted guy wires, and completed instrumental installation of fourth, third, and second levels. |
|||
Kale, kevin, and Qianyu |
Tree, Kale, and Kevin were adjusting guy wires |
||
Tree, Kale, and Kevin were adjusting guy wires |
Tree, Kale, and Kevin were adjusting guy wires |
||
Sonics and Li-Cos were mounted on fifth and fourth levels |
Tree was cranking up the tower to a final position |
||
Kale and Tree was working on fourth level for hub and boxes |
Kale and Tree was working on fourth level for hub and boxes |
||
Kale and Tree was working on third level |
Kale and Tree was working on third level |
||
Kale and Tree was working on third level |
Kale and Tree was working on third level |
||
Kale and Tree was working on third level |
Kale and Tree was working on third level |
||
Kale and Tree was working on third level |
Kale and Tree was working on third level |
||
Kale and Tree was working on third level |
Kale and Tree was working on third level |
||
Kale and Tree was working on second level
|
Kale and Tree was working on second level
|
||
Kale and Tree was working on second level |
Lowes four levels on the top-hill tower |
||
3D-sonic and Li-Co on top level of the top-hill tower |
Kevin was lifting instruments |
||
November 5 (Monday), 2012 Qianyu worked on data logger, while Eric and Tree finished the instrumental installation of lowest level on the slope-tower as well as worked on generators. |
|||
Eric, Tree were working on lowest level of the slope-tower, while Qianyu was working on the data logger |
Eric and Qianyu |
||
Eric and Qianyu |
Lunch time (very cold) |
||
All five levels were done. Qianyu was working on datalogger |
Eric was working on generator |
||
It was complicated with so many cables and wires |
Eric and Qianyu |
||
November 6 (Tuesday), 2012 Qianyu and Eric were working on datalogger on the slope-tower, while George and Tree worked on generators. |
|||
George came with Eric, Qianyu, and Tree worked on generators after his class. Qianyu was working on data logger |
George, Qianyu, Eric, and kids |
||
George, Qianyu, and Eric |
George |
||
George and Tree were shopping in Home Depot |
George found a solution to connect gas tank to generator |
||
Eric was working on a data logger for 2D sonics |
|||
November 9 (Friday), 2012 Qianyu and Eric were working on datalogger on the slope-tower, while George and Tree worked on generators. November 7-8 were snowing. |
|||
Road was blocked due to students from Columbia University were doing biometric experiments |
Qianyu |
||
George was working on connection between a generator and a gas tank |
Qianyu was working on data logger |
||
This was a complicated work. There were so many instruments: five 3D sonics, five Li-Cos, eight temperature sensors and PAR and Net Radiation sensors |
Only lowest level showed data, why the other level did not work? |
||
Qianyu had climbed up and down the tower many times to solve the puzzle |
Qianyu had climbed up and down the tower many times to solve the puzzle |
||
Qianyu had climbed up and down the tower many times to solve the puzzle |
Qianyu had climbed up and down the tower many times to solve the puzzle |
||
Qianyu had climbed up and down the tower many times to solve the puzzle |
Eric was checking which level was working |
||
George, Bill Schuster and Bill's friend, and Eric |
Qianyu and Eric (so far only one level could work) |
||
November 10 (Saturday), 2012 Qianyu and Li were working on datalogger on the slope-tower, while George and Tree worked on generators. Eric was working on Li840 on the top-hill tower. |
|||
George was testing batteries. Qianyu was disconnecting/connecting wires on the tower, while Li was reading the responses of Qianyu's performance on the tower |
Qianyu was disconnecting/connecting wires on the tower, while Li was reading the responses of Qianyu's performance on the tower |
||
Qianyu was disconnecting/connecting wires on the tower, while Li was reading the responses of Qianyu's performance on the tower |
The position of 3D sonic and Li-Co at the top level on the top-hill tower were changed by the Sandy hurricane. Eric and Tree moved them back to the right position. |
||
Lunch time: Eric, Qianyu, and Li |
Betsy, George, and Tree were walking to the top-hill tower and working on batteries and generators |
||
Eric was working on Li840 on the top-hill tower |
George was working on generator for the top-hill tower with Betsy |
||
Qianyu was disconnecting/connecting wires on the tower, while Li was reading the responses of Qianyu's performance on the tower |
Sonic and Li-Co on fifth level could work alone without connection to the all lower four levels. That was good news because it is dangerous to climb the top level of the tower |
||
Qianyu was trying and testing level-by-level |
George was working on battery, while Li was working with Qianyu for the testing |
||
Sometime Qianyu was discussing with Heping at WSU |
Li was reading the data logger with flashlight |
||
Eric, George, and Li |
Qianyu was testing from level to level |
||
Finally, all levels could work at the same time |
This was the most excited moment: Qianyu was smiling |
||
This was the most excited moment: Qianyu and Li |
This was the most excited moment: Tree, Qianyu, George, Betsy, and Eric |
||
Li, Qianyu, and George as well as Betsy and Tree were going back to the BRF lodge to make dumpling to celebration |
Qianyu wanted to bring the memory card to check the data in the lodge |
||
George wanted to make sure that the batteries were working with Betsy |
When some (Li, Betsy, Joan, and Tree) started making dumpling. Qianyu found some errors in the data logger and George and Qianyu went back to the tower |
||
Li, Joan, and Eric were making dumpling |
George was making garlic sauce, Betsy was cooking, Eric and Joan, Li and Tree were making dumpling |
||
Joan, Li, and Eric |
Betsy, Joan, and Li |
||
Betsy was cooking dumpling, while Eric learned how to make a dumpling skin from Li |
Celebration for all instruments on the slope-tower being able to work: George, Li, Qianyu, Joan, Oscar, Eric, and Betsy |
||
Matt from BRF was invited to join our celebration by playing the liquor game with George and Tree |
George and Betsy breakfasted in the morning of November 11, 2012 |
||
November 11 (Sunday), 2012 Qianyu and Li were working on datalogger on the top-hill tower, while George and Tree worked on generators. |
|||
Qianyu and Li were working on Li840 for CO2/H2O profile measurements |
Qianyu and Li were working on Li840 for CO2/H2O profile measurements |
||
Qianyu and Li were working on Li840 for CO2/H2O profile measurements |
Tree |
||
George was working on the generator (Honda) |
George started the generator (Honda) |
||
The generator (Honda) was smoking and dead. We bought three generators (Honda). Two of them were dead already. |
George and Tree decided: (1) to buy one more generator as soon as possible; and (2) to try using one generator to support two towers. |
||
George and Tree first went to Home Depot nearby to buy a new generator |
Qianyu was checking the data logger for top level on the top-hill tower |
||
The view of the slope-tower from the top-hill tower |
The view of the top-hill tower |
||
After George and Tree bought a new generator, they changed the wire system path into: a generator --> slope-tower --> top-hill tower. Due to the wires were short, they went to truevalue to buy one more 250 ft wires |
Qianyu and Li had been working without lunch due to George and Tree had been very busy for shopping generator and wires |
||
George, Qianyu and Li |
Qianyu and Li |
||
November 12 (Monday), 2012 Qianyu was working onLi840 on the top-hill tower, while George and Tree worked on generators. |
|||
Qianyu first checked the data collected by the slope-tower. All instruments were working on this tower though the generator (Honda) was dead |
All instruments were working on this tower though the generator (Honda) was dead |
||
Qianyu continued working on Li840 |
Qianyu continued working on Li840 |
||
Qianyu continued working on Li840 |
Third generator (Honda) was dead. We had to use the new generator we bought yesterday. George was reading the manual |
||
George was reading the manual |
George and Tree pulled the generator to the location |
||
George quickly found a way to link the generator to the gas tank |
It worked |
||
George |
George, Qianyu met a few visitors |
||
Qianyu had worked there for almost whole day. It was very cold |
George discussed with Qianyu about the solution for Li840's problem |
||
Qianyu was calling Li840's company |
George and Qianyu were discussing how to solve the problem in the trueValue store |
||
November 13 (Tuesday), 2012 Qianyu and Eric came to BRF to fix Li840's problem on the top-hill tower, moved the gas tank from the tophill to the slope, and checked the generator. |
|||
November 14 (Wednesday), 2012 Qianyu, George, and Tree came to BRF to fix Li840's problem on the top-hill tower, and filled gases for the generator. |
|||
We often bought sandwiches for lunches from here |
We often bought sandwiches for lunches from here. This was last time |
||
Lunch time |
George drove his own car not departmental van |
||
A teacher had a class there. George and Qianyu |
Qianyu first checked the data |
||
Qianyu was solving the Li840' problem |
George was on the top of the fire tower |
||
Tree was on the top of the fire tower |
George and Qianyu were discussing solution |
||
George breathed air to the tube to make a test |
Not right |
||
George wanted to do another test |
George wanted to do another test |
||
Not right! George decided to take the data logger back to QC lab to test |
Sunset |
||
Slope tower |
Jing Yuan came with her husband (Haibo Liu) to make branch area density measurements |
||
Haibo Liu took photos for branch area density measurements |
George and Qianyu were working in the lab |
||
Qianyu, Betsy, George, Li, and Tree all were in the lab |
Qianyu, Betsy, George, Li, and Tree all were in the lab |
||
Qianyu had worked till midnight, and Tree and Li gave her a ride |
|||
November 15 (Thursday), 2012 Qianyu fixed the Li840 problem last night. Eric and Qianyu came to setup the data logger for LI840. |
|||
November 16 (Friday), 2012 Due to hunting season started on November 17, all intruments must be taken down today. George, Tim, Tree, Qianyu, Xiyan and Tommie focused on the slope tower, while Eric, Nir, Kevin, Christine focused on the tophill tower. |
|||
Qianyu, Tree, Kevin, Christine, Tommie, and George |
Eric and Nir |
||
Tommie, Qianyu, Eric and Nir |
Kevin, Nir, and Tree |
||
Nir, Tree, Christine, and Kevin |
Qianyu |
||
Tree and Nir used grasses to test where a recirculation would be |
George, Nir, and Eric |
||
George measured the heights of five levels with Nir |
George measured the heights of five levels with Nir |
||
They started taking instruments down after 12:00 PM |
George, Tree, Tim, Qianyu, and Tommie |
||
Kevin, Nir, and Eric |
George and Tim |
||
George and Tim |
On the way back to Queens. Eric drove a van with Qianyu. Tim drove a van himself. George drove a van with students, as well Nir and Tree |
||